Location | MGZ Lübeck |
Construction period | March 2008 to April 2008 |
Short Description | Construction of 1 new radiation shielding bunker in Forster sandwich construction method including radiation shielded door system |
Special Features | Realization of a 1.35m-thick floor slab made of super heavy concrete with a bulk density of up to 5.0t/m³ under the bunker |